Induction systems

Regular testing is necessary to ensure that induction systems function optimally. In older systems in particular, weak points that have developed over time, for example due to material fatigue or soiling of the system, can be identified and rectified. LTG's engineering services are also happy to provide support with primary pressure balancing, adjustment and commissioning for newly installed systems. Our services include, among others:
  • Measurement of the pressure distribution at various devices in a line of the building to avoid pressure differences in the duct network and an ideal setting of the system
  • Determination of the primary air volume flow via the static pressure in the plenum box for optimum control and adjustment of the system
  • Checking the function and operating parameters of induction units (valve control, air tightness, supply air, primary air, intake temperature and primary pressure)
  • Recommendations for the installation of suitable pressure measuring points with a variable number of devices per line (systems with constant pressure)
Whether renovation or new construction, whether conceptual questions or practical functional testing - LTG engineers will be happy to support you.